Loss of voltage to the control circuit for the disconnecting means shall cause a supervisory signal to be indicated at the control unit and required remote annunciation. Article 511 provides the requirements for commercial garages areas used for the storage or repair of self-propelled vehicles that use combustibles (liquid or gas) for power. Recommendations for EazyLift Elevators, Stairlifts, Wheelchair Lifts The Code provides guidance through regulations to establish requirements. Later in the 19th century, Thomas Edison and his associates built an electrical distribution system in Lower Manhattan. The basic idea is that there must be a separate, dedicated circuit for car lights, receptacles and ventilation on each car. Motor feeder short circuit and ground-fault protection must be as required in Article 430, Part V for all motors. It is important, where mandated, that there be no more than a single disconnecting means, so if emergency action is required, first responders will not be able to power down the equipment from one location. An example would be the elevator, as well as all wiring in a utility-owned administration building. And as the designer, you can become the fulcrum on which all of these requirements and authorities exert their leverage, but an understanding of elevator basics can help you handle the pressure. In all cases, the working space must permit at least a 90 opening of equipment doors or hinged panels. Guarding: Where possible, install temporary guarding to protect from inadvertent contact. There are several actions that could trigger this block including submitting a certain word or phrase, a SQL command or malformed data. Bonding of elevator rails to a lightning-protection system grounding conductor is permitted, but the conductor itself is not to be located in the hoistway. PDF C.1 General Requirements for All Elevator Installations 836 Troy Schenectady Road Latham, NY 12110 . The main concern is to ensure that workers may escape to safety in the awful circumstance of an arc-fault event. It provides that where more than one driving-machine disconnecting means is supplied by a single feeder, the overcurrent protective devices in each disconnecting means are to be selectively coordinated with any other supply side overcurrent protective devices. +1-251-479-4514 | [emailprotected], Trkiye Office or larger is permitted to be installed in lengths in excess of 6 ft. Where motor-generators, machine motors or pumping-unit motors and valves are located adjacent to or underneath control equipment and provided with extra-length terminal leads not exceeding 6 ft. in length, such leads are permitted to be extended to connect directly to controller terminal studs without regard to carrying-capacity requirements. Metal grating shall be installed over the hole that sits flush with the pit floor. As for height, the working space must extend from the grade, floor or platform to 6-1/2 ft. or the height of the equipment, whichever is greater. Get more of Elevator World. In hoistways not longer than 6 ft., these additional wiring methods are permitted: A sump or oil-recovery pump located in the pit is permitted to be cord connected. Indeed, most elevator accidents involve maintenance workers, yet even theirs is not an excessively dangerous profession. 1993 NEC 15-20 Amp 120 volt Receptacle Requirements: Wet bar sinks, all bathrooms, roof tops, elevator machines rooms, elevator car tops, elevator pits. You must run a separate insulated grounding conductor with the feeder conductors from the electrical source to the elevator controller. NEC specifies Hoistway wiring, and doesn't seem to distinguish between hoistway and pit. IAEI News Magazine. NEC articles generally adhere to a template, which greatly aids in navigating and quickly locating mandates as needed for project design or, on an installation level, in the field. PDF Elevator Safety Program - Technical Clarification One way to achieve this is by paralleling wires, i.e., connecting the runs at both ends so they are physically like two wires but electrically one. The same figure applies to nonmetallic wireways. Of particular importance is the location of the disconnecting means so it can be found by an individual who may not be familiar with the installation. Elevator travel is far safer than an automobile trip, and the chance of experiencing disaster is on the order of being struck by lightning in ones own backyard. These conductors may be covered with suitable shielding for telephone, audio, video or higher-frequency communications circuits. Smoke detectors, which are required in all elevator lobbies and elevator equipment rooms, must be connected to the elevator controllers directly by means of auxiliary contacts and wiring, or indirectly by means of output signals from the fire alarm control panel. Notwithstanding, if sprinklers are installed in hoistways, machine rooms or the like, the disconnecting means is permitted to automatically open the power supply to the affected elevator(s) prior to the application of water. With heavy use on a hot day, the oil can overheat, causing elevator shutdown. The disconnecting means is to be an externally enclosed, operable, fused motor circuit switch or circuit breaker capable of being locked in the open position. 6 Stop Switch in Pits There shall be installed in the pit of each elevator an ASME A17.1 CODE enclosed stop switch or switches meeting the requirements The following material is reprinted with permission from the American of 2.26.2.7 and 2.2.6.1 through 2.2.6.3. It is important for the design engineer to coordinate with the architect to determine the elevator manufacturer basis of design to determine if and when additional power and lighting is required. Mobile, AL 36606 USA First, you'll need to install lighting in the elevator equipment room (Photo 1) and shaft pit (Photo 2). Besides the initial determination requirement of paragraph (c) (1), the "host" employer must comply with the five (5) requirements of paragraph (c) (8) when engaging another employer (contractor) who will have employees in permit spaces under the control of the host employer. A single dedicated receptacle supplying a permanently installed sump pump does not have to be a GFCI type. Something went wrong. The conduit alone can't act as the grounding means. The thinking behind this requirement is that the injured worker could have severe hand burns and be unable to operate a conventional doorknob. In a time when increasing value is placed on even small amounts of real estate, elevator design must strive to configure, efficiently control and drive elements to whatever degree possible, and that is the thinking behind some alternate locations for these structures. The code notes that elevator rails or other hoistway equipment are not to be used as the grounding conductor for lightning-protection systems. Therefore, elevator equipment rooms must maintain a temperature between 50F and 90F. charlie b. With the elevator car at the bottom landing, it is the length of cable as measured from the point of suspension in the hoistway to the bottom of the loop. Cloudflare Ray ID: 7a2fbe9ebd7e2fe8 Since 1953, Elevator World, Inc. has been the premier publisher for the global vertical transportation industry. hb``` ea``j~p2nfH 'xXg00,/(_ Iq8PDdg-~ s$!XI;Fn0vu `h`R 1y 0B.":9.@, e`xI;=7O3fvbb8:SC;%O*20] NFPA 72 requires the control circuit between the Fire Alarm System and the shunt trip be monitored for integrity. These must also be insulated for the maximum voltage applied to any conductor within the cable or raceway system. Similar provisions are attached to elevator-car heating and air-conditioning disconnecting means, and to other utilization equipment. In such cases, it's economically justifiable to specify a traction type elevator. from components that are not otherwise guarded. These 29 CFR 1910.146 (c) (8) requirements are: Selective coordination is also required for multiple elevators per NEC 620.62. For all of this to come together in the real world, there had to be some assurance that these new technologies could be used safely on a wide scale. Good documentation is of key importance to recalling what decisions were made and why. The architect has a choice of either traction or hydraulic elevators. GET YOUR CEUS TODAY, 1998-2021. As recommended in NFPA 70E, the National Elevator Industry, Inc. (NEII) commissioned an arc-flash hazard analysis (in compliance with IEEE Standard 1584-2002 for procedures for calculating the incident energy of the arc flash) by an independent consultant to determine at what level an arc-flash hazard exists to employees who work on energized elevator equipment. The elevator controller manufacturer must determine the required elevator controller SCCR as stated in the elevator controller specification and provide an elevator controller SCCR that is equal to or greater than the available fault current thats indicated in the design documents where there are multiple elevator controllers at different locations. Regardless of the number of elevators, only one smoke detector is required at each floor lobby, but it must be located within 21 ft of every elevator door. The simplest option is to use a shunt trip circuit breaker in either the feeder supplying the elevator or the elevator disconnect. 3016. Pits for Elevators. - California Department of Industrial Relations (All intentionally grounded elements must be held at equal potential.) After such an event, it is important that the affected worker is able to escape the area and get to help. Below is a summary of these new 2017 NEC sections: In order to comply with these requirements a chain of events must occur. Elevator Pit Sump Pump Electrical Requirements By Nat July 30, 2022 Bulls Eye (Simplex) Receptacles: Bulls eye (simplex) receptacle for Sump pumps (now not - GFI) on a delegated circuit will be required in all elevator pits for the elevator pit sump pump. NEMA 4 : All electrical equipment, located less than 1225 mm (48 in.) ELECTRIC PASSENGER & FREIGHT ELEVATORS ASME A17.1 2004 Electric Elevator Checklist 2004 Multi-car.doc Page 4 of 44 Page Completed for cars : - Last Updated: 8/1/05 Car Enclosure Electric 2.14 - Hydraulic 3.14 A17.1 (A17.2) COMMENTS CARS 1-6 Operating Control Devices ADA Requirements Finally, in 1897, the first National Electrical Code (NEC) appeared. We have circuited the receptacles and lights in the pits to the same circuit. David Herres PDF Compliance with the 2017 NEC for Elevator Controllers (e) Pit Maintenance. Personal protective equipment (PPE): Use appropriate PPE to protect body parts within the range of 3-16 in. A single means for disconnecting all ungrounded main power-supply conductors is required and must be designed so no pole can be operated independently. 3. Additionally, duty on elevator and dumbwaiter motors is rated as intermittent, whereas duty on escalator and moving-walk motors is considered continuous. +90 (216) 348 4876, India Office f?3-]T2j),l0/%b Therefore, there will be two signals to the elevator control panel related to smoke detectors: one from the designated floor smoke detector and another combined signal from the smoke detectors at the other lobby landings and in the equipment room. You are a subscriber that needs to Sign In. As greater numbers of elevators are added, the likelihood of them all operating simultaneously decreases so that it is permissible to reduce the feeder ampacity. q!^mDtsnEX3_ shvqu+X9@w3gSj`g Compliance with the 2017 NEC for Elevator Controllers The two primary hazards are fire and electric shock or arc flash, although there are others. Notice the definition mentions the full range of operating times. If elevators are supplied by the emergency, legally required standby or critical operation power systems, then selective coordination is required per the 2017 NEC in 700.32, 701.27 or 708.54. It is worth noting that these NEC terms, used throughout Article 620, have been chosen to correlate with A17.1-2007 usage. This, however, can result in a dramatic increase in cost, space availability (lack thereof), and reduced efficiency. APPENDIX A 2.2. He participates in IEEE (Senior Member) with Industrial and Commercial Power Systems, NEMA (member of the Codes & Standards Committee), NFPA (committee member for NEC CMP-13 and NFPA 79), UL (508/60947 and 508A) and IAEI activities. (To design and install an elevator for a Class I, Division 1 location would be quite an undertaking.). The AHJ is saying that this is a violation of 620.23. The main impetus for the creation of the NEC in the closing years of the 19th century was the collective anguish experienced by insurance underwriters who were losing vast amounts of money due to liability and physical damage claims resulting from Edisons electrification of, first, Lower Manhattan and then the world. The surest means of avoiding an arc-flash hazard is to lockout and tagout the electrical service to a controller. Elevator PITS | Mike Holt's Forum The two documents are in harmony and should be used in conjunction. In these installations, it is best to design the elevator controller so the elevator controller SCCR is adequate for the available fault current. If power is not being supplied to the elevator controller (e.g., open mainline fuses, etc. For platform lifts and stairway chairlifts, the duty is intermittent. A further requirement concerns elevator-car air-conditioning and heating. A traction elevator's equipment room is typically located at the top of the building, directly over or adjacent to the shaft. Fluid pressure in the cylinder raises and lowers the elevator cab. Part VIII, Machine Rooms, Control Rooms, Machinery Spaces, and Control Spaces, states elevator and similar-installation driving machines, motor-generator sets, motor controllers and disconnecting means are to be installed in a room or space set aside for that purpose. Lights and convenience outlets in elevator pits shall be installed to comply with the requirements of CCR, Title 24, Part 3, Article 620. For just $7.99 per month, you can gain access to more than 5,000 articles from all Elevator World Publications, this includes EW Global, EW Europe, EW India, EW Middle East, EW Turkey, and EW UK. Generally, it is decreed that the supply voltage is not to exceed 300 V between conductors (allowing for the familiar 240-V concept), although there are exceptions. All equipment in a machine room-less design is installed within the elevator shaft or exterior compartment near the elevator shaft, including the elevator controller and the elevator disconnecting means. Regardless of the number of elevators, only one smoke detector is required at each floor lobby, but it must be located within 21 ft of every elevator door. It need not be exactly centered on the equipment, and working spaces of adjacent pieces of equipment may overlap. NEC 2011 Article 620.21(2)(b) states that hard-service cords and junior hard-service cords that conform to the requirements of Article 400 (Table 400.4) are permitted as flexible connections between the fixed wiring on the car and devices on the car doors or gates. It is further stipulated that internal voltages of power-conversion equipment and functionally associated equipment, and the operating voltages of wiring interconnecting the equipment, are permitted to be higher, provided that the equipment and wiring are listed for the higher voltages. The light switch shall be located so to be accessible from pit access door. Hydraulic reservoir characteristic of a hydraulic-piston-operated elevator. It is further stressed that no provision is to be made to open or close the disconnecting means from any other part of the premises. These may include: The author would like to recognize Jonathan Kennedy for his assistance in creating this article. They are permitted to be run without raceway when used inside the hoistway, on the elevator car, hoistway wall, counterweight, or controllers and machinery located inside the hoistway, provided they are in their original sheaths. U.S. Latham, NY Shopping Miscellaneous Retail Stores, NEC Wheelchair lifts EazyLift Elevators, . Because of this, several manufacturers offer an all-in-one shunt trip elevator disconnect switch that includes all the prewired accessories needed to comply with the various Code sections. They must be in enclosures with doors or removable panels that can be locked in the closed position. Selective coordination is defined by the NEC as: Localization of an overcurrent condition to restrict outages to the circuit or equipment affected, accomplished by the selection and installation of overcurrent protective devices and their ratings or settings for the full range of available overcurrents, from overload to the maximum available fault current, and for the full range of overcurrent protective device opening times associated with those overcurrents.. This may include wiring for signals, communication with the car, lighting, heating, air-conditioning and ventilation of the car or hoistway for fire-detecting systems and pit sump pumps. Use the below learning-reinforcement questions to study for the Continuing Education Assessment Exam available online at www.elevatorbooks.com or on page 81 of this issue. Which equipment requires a separate branch circuit in the elevator car? Is lighting required to be GFCI protected in the machine room? Where is the lighting switch to be located in the machine room? What is the maximum raceway conductor fill in an elevator hoistway? How many disconnecting means are required for an elevator power supply? Performance & security by Cloudflare. Though I understand how someone might argue two. NEC Article 620 Part V, Traveling Cables, is driven by two major issues. Dont troubleshoot unless you can keep your shoe/boot soles dry. If a smoke detector goes into alarm, it signals the elevator to go into Fire Recall Function, at which point the controller directs the elevator cab to travel to its pre-programmed designated landing, open its doors, and remain stopped there until the alarm clears. Flexible metal, liquid-tight flexible metal or liquid-tight flexible nonmetallic conduit 3/8 in. Section 620.37 re-emphasizes that only wiring used in connection with the elevator is permitted within the hoistway, machine room, control room/machinery space or control space. The demand factors are given in Table 620.14, which allows significant reductions as the number of motors is increased. Hard-service cords are permitted only as flexible connections for the top-of-car operating device or the car-top work light. For example, an inadequately supported ceiling fan could fall and cause injury or property damage. Firefighters can then use portable telephone handsets in combination with the jacks and cabling. (A) tells us that the lighting and receptacle (s) for the pit must be on separate circuits. This requirement applies to all controllers, disconnecting means and other electrical equipment that may need servicing, inspection or maintenance. Inspecting Elevator Power Wiring - IAEI Magazine z, /|f\Z?6!Y_o]A PK ! It is also worth mentioning that the stated purpose of the NEC is the practical safeguarding of persons and property from hazards arising from the use of electricity. It begins by considering metal and nonmetallic wireways. Dec. 21, 2010. Supports for cables or raceways in a hoistway or in an escalator or moving-walk wellway or platform lift and stairway chairlift runway must be securely fastened to the guide rail, escalator or moving-walk truss, or to the hoistway, wellway or runway construction. endstream endobj startxref In elevators provided with Firefighters' Emergency Operation, a drain or sump pump shall be provided. Here, the National Electrical Safety Code has jurisdiction. These are the individual branch circuits required for car lighting, receptacles, auxiliary lighting and ventilation on each elevator car; individual branch circuits for machine-room and similar location lighting and receptacle; and branch circuits for hoistway pit lighting and receptacle(s). Besides the power-supply disconnect discussed, it is provided that elevators have a single means for disconnecting all ungrounded car lights, receptacles and ventilation power-supply conductors for that elevator car. (Hard-service and junior hard-service are trade names that apply to over 30 types of flexible cord, all beginning with the letter S. They have varying properties, such as oil resistance, and various material compositions for insulation, such as a thermoplastic elastomer. [emailprotected] The traveling cable or raceway is also permitted to include shielded conductors and/or one or more coaxial cables. For current-limiting fuses, the information to achieve selective coordination has been available for many years in fuse amp ratio tabular form. The usual scenario for electrical injury is shock when electrical current passes through the human body. The pump sends hydraulic fluid from the reservoir to the cylinder, buried deep below the elevator shaft. NEC Article 0: Elevator art by David Herres Continued. Fireman telephone jacks and telephone cabling are typically sufficient for each of these locations. NEC 620.62 requires the elevator disconnecting means (fused switch or circuit breaker) to selectively coordinate with all supply-side overcurrent devices. A section on branch circuits for car lighting, receptacles, ventilation, heating and air-conditioning contains a number of important provisions. Pit light with guard (ten foot candles min. . The basic rule for conductor fill of a metal wireway, as given in Article 376, is that the sum of the cross-sectional areas of all contained conductors at a cross section of a wireway is not to exceed 20% of the interior cross-sectional area of the wireway. Here are 23 ways that both chapters and the national office can meet todays major challenge of making members feel valued, IAEIs Online Training allows you to learn at your own pace or live with an expert instructor, from the comfort of your laptop or PC. Also located in this room might be, but not limited to: exhaust fan, cooling unit (depending on local requirements and/or requirements set forth by the individual elevator supplier), lighting, voice and/or data drop serving the elevator cab emergency phone, elevator controller primary fused disconnect, elevator feeder shunt-trip circuit (i.e., shunt-trip circuit breaker), elevator cab lighting fused switch, and convenience receptacle(s). They are to be part of listed equipment, a driving machine or a driving-machine brake. Moreover, because motors have a higher starting current than other loads, the overcurrent protection protocol is unique to them and somewhat counterintuitive. When the elevator car is at the top landing, it is the length of cable as measured from the point of suspension on the car to the bottom of the loop. In some cases, it may require a means to test the shunt trip operation or have one contact operate the shunt trip of more than one elevator. The two main types of elevators are hydraulic and traction. Part of the reason that elevator usage is extraordinarily safe is that construction and maintenance are regulated by the wonderfully robust ASME A17.1 2007/CSA B44-07 Safety Code for Elevators and Escalators, which contains overall construction and maintenance requirements everything from seismic mandates to machine-room lighting. NEC 2011 also addresses branch circuits for machine room or control room/machinery space or control-space lighting and receptacles. You are seeing this message for one of three reasons: You have reached your limit of free content. 2. The proposals resulted in adding new requirements in the 2017 NEC for: This article will also discuss other Code requirements that include selective coordination for elevators that are supplied by emergency, legally required standby or critical operation power systems or multiple elevators supplied from a single feeder, and shunt tripping of elevators where the elevator equipment room and/or shaft has a fire suppression sprinkler system. Special conditions: Troubleshooting in wet, hot or cold conditions calls for extra caution. Shi Liguang, Yao Lianghong, Luo Zhiqun and Wan Jianru, Constructional Stretch and Hoist-Rope Tension . This clear working space must be 30 in. This is the area within the hoistway beneath the car, and there are occasions when elevator technicians have to work in this area for maintenance and troubleshooting. If elevators are supplied by the emergency, legally required standby or critical operation power systems, then selective coordination is required per the 2017 NEC in 700.32, 701.27 or 708.54. It is conditionally provided that fiber-optic cables and conductors for operating devices, operation and motion control, power, signaling, fire alarm, lighting, heating and air-conditioning circuits of 600 V or less are permitted to be run in the same traveling cable or raceway system. The floor specified as the designated landing, which must be approved by the Fire Marshal, is usually the floor on grade level so passengers can quickly exit to the outside. The conductors must be in their original sheaths or grouped together and taped or corded. Additionally, ampacities of the individual conductors and flame-retardant properties of the overall cable are important factors. Where the elevator shaft and/or equipment room has a sprinkler fire suppression system installed, the elevator Code requires main line power to the elevator be removed prior to the application of water. Hydraulic elevator installations are typically supplied from the main switchboard and have an elevator fused switch or circuit breaker in the machine room that serves as the elevator disconnect. The fire loading resulting from an accumulation of abandoned low-voltage cabling may be considerable, and has to be understood and dealt with. Other terms defined in NEC Article 620 are Control System, Motion Controller, Motor Controller, Operation Controller, Operating Device and Signal Device. In an elevator machine room, where space may be limited in the first place, the working-space mandate must be factored in very early in the design process lest an unthinkable amount of rework be necessary. Hydraulic elevators are typically more cost effective and used for buildings up to 5-6 stories. Sumps and sump pumps in pits, where provided, shall be covered. endstream endobj 954 0 obj <. Otherwise, specify that the elevator supplier provide a battery back-up unit to power the lights in the event of an outage. 354 Morgan Ave. Every building is different. Motors for traction elevators were traditionally DC or synchronous, but new installations use AC motors and VFDs for speed control. The basic wiring methods are rigid-metal, rigid nonmetallic or intermediate-metal conduit; electrical metallic or rigid nonmetallic tubing; wireways; or Type MC, MI or AC cable, unless otherwise permitted. z!0: - [Content_Types].xml ( n0EUb*>-RxV=QUAl"93dFk%Y?l}MGDV On existing or listed equipment, conductors are permitted to be grouped together and taped or corded without being installed in a raceway. Corporate Office Limit switches placed throughout the height of the shaft communicate with the controller and stop the cab at each landing. Installing electrical equipment where its SCCR is less than the available short-circuit current creates serious safety hazards.