The train operated over Union Pacific between Omaha and Ogden, and between Ogden and Los Angeles. The George M. Pullman after running on several other limited trains was sold to the Chicago Great Western in 1952 and was scrapped in 1964.
UP: UP No. 3985 - The Challenger - Union Pacific Corporation But they still sold brandy and cigars." U. P. asked to discontinue the two train runs two years ago and was denied its application by the ICC. They were paid $125 per month plus expenses. (Jeff Asay, Union Pacific in the Los Angeles Basin, page 404), Trains 5 and 6 were shown in the UP Public Timetable dated September 7, 1969, but not in the timetable dated October 30, 1969.
UP #3985 and #5511 Return To The Mainline! (Union Pacific Donation Due to its secondary status, its heavyweight cars were painted in UP's Dark Olive paint. (Some Classic Trains, page 179), July 20, 1931
Union Pacific / C&NW / SP Advertising Brochure - The Challenger Passenger Train | Collectibles, Transportation, Railroadiana & Trains | eBay! San Francisco Overland changed to operate Oakland to St. Louis; all Oakland to New York sleepers were transferred to City of San Francisco, May 4, 1955
Still, it wasn't possible to maintain daily streamliner service between Chicago and the Los Angeles, San Francisco, and Portland areas until 1947. E9B passenger locomotive shell. The Treasure Island Special stopped operating on September 18, 1940 and did not resume operations the following year because the Exposition had ended and there was not enough traffic to justify it. Because of a shortage of diners suitable for transcontinental service, this diner operated on the Special until June 4, 1939 when the C&NW diner 6934 emerged from the shops and replaced it. The Challenger type eventually found work on eight other carriers, in places as disparate as Bozeman Hill on the Northern Pacific, Ararat summit on the Delaware & Hudson, and deep in the Appalachians on the Clinchfield. September 25, 1960
Union Pacific at one time owned 105 Challenger locomotives. Union Pacific Historical Society Endowment Fund. "At Silver Bow, a Northern Pacific Geep would be placed on the point and the NP crew would run the train into Butte. The 10 section, 1 drawing room, 2 compartment car and the two 6 compartment, 3 drawing room cars had been refurbished, air conditioned and repainted but not remodeled in 1938. The track also featured exclusive coaches for women and children at the head of the train, thus eliminating the need for men to even walk through the cars." Union rules require 15 crewmen, each receiving a day's pay, to move the train over the 433 miles from Salt Lake City to Butte, and another 15 men on the return trip. See also: John Carroll's two-part article in The Streamliner, published by the Union Pacific Historical Society in 1994-1995 "The Challenger" Part I, The Train, in Volume 9, Number 4 9 between Ogden and Sparks. SP met UP's Overland trains at Ogden with its connecting westbound trains operating as the Pacific Express and eastbound trains as the Atlantic Express. $499.99. The return trip departed Los Angeles on December 21st. Further consolidations occurred in the 1960s and by 1970 the Challenger, City of Denver, City of Los Angeles, City of Portland, and City of San Francisco were combined into one giant train across Wyoming, called by some the "City of Everywhere".[3]. Challenger. Atlas 10 003 674 HO U28C Locomotive Silver - Union Pacific #2803. At the same time in Ogden, Westbound train 101, The City of San Francisco would arrive, and it would split into the Los Angeles section and the Oakland (San Francisco) section. The economy service ran between Chicago, Illinois, and the West Coast of the United States. Overnight sleeper service was also offered between Salt Lake City and Victor, Idaho, the gateway to Grand Teton National Park and Jackson Hole. 24.77 + 21.05 Postage. 304811955055 Omaha, Nebraska and Chicago. February 26, 1933
Most of its Pullmans began operation on the RI-SoP Arizona Limited. To offer daily service between three west coast points and Denver, in addition to the other daily trains already operating, involved a tremendous outlayof equipment and personnel. (Portions taken from "Union Pacific Mainline Passenger Services, 1921-1971" by David Seidel, The Streamliner, Volume 22, Number 3, pages 20-21; center spread), (Portions taken from Jeff Cauthen, via email dated March 17, 2007), With the opening of the "Golden State International Exposition" in 1939, more service was needed with a seasonal summer all Pullman the "Treasure Island Special". The following comes from an email from Doug Dirks, dated March 7, 2013: The Gold Coast was a train on the Overland Route with a slow schedule. services C&NW citing declining transit times. 27 between Ogden and Sparks. Pacific to offer patrons the availability to ride between I don't know whether the units were fully "laced up", but a BN fireman once told me that someone once forgot to retract the deadbolts inthe UP E-unit's nose door at Silver Bow and they had to stop the train to rectify the situation, before they could proceed." Union Pacific 3985, also known as the "Challenger", is a four-cylinder simple articulated 4-6-6-4 "Challenger"-type steam locomotive built in July 1943 by the ALCO of Schenectady, New York, for the Union Pacific Railroad. Their design and operating experience shaped the design of the Big Boy locomotive type, which in turn shaped the design of the last three orders of Challengers. Items 3, 4, and 5 were Pullman demo cars and were painted in the demo paint. See also: "Union Pacific's Challenger, An Unusual Passenger Train, 1935-1971" by Patrick C. Dorin, TLC Publishing, 2001. Ending Tuesday at 5:19PM PST 17h 54m. Lounge cars were designed for single, double, and table seating. According to the July 1960 Official Guide, "Mail and Express No.
Lionel 635 VIntage O Gauge Postwar Union Pacific NW-2 Diesel Switcher 45 min. [1], A sleeping car in day mode; the berths are folded above the seats, The dressing room in a women's sleeping car, Diesel-powered, streamlined version of the Union Pacific, Last edited on 27 February 2023, at 16:41, "Railroading Heritage of Midwest America - official website", "Railroading Heritage of Midwest America, Union Pacific agree to donation of Challenger, other locomotives, cars", Passenger trains operating on the eve of Amtrak, https://en.wikipedia.org/w/index.php?title=Challenger_(train)&oldid=1141931454, 2,225 miles (3,581km) (Chicago-Los Angeles, 1954), December 8, 1953: The CNW / UP announces that the, February 1955: a dome coach is added to the, November 1955: The Milwaukee Road assumes operation of the, 1970: Dome diners are removed from all UP passenger trains, including the, Coach (44 seats) UP #5484 (taken off at Omaha), This page was last edited on 27 February 2023, at 16:41. San Francisco Challenger changed to Trains 23 and 24, May 14, 1947
After Amtrak took over national passenger services in 1971, it spent time as AMTK #446, #1920 and #670 before being reacquired by the Union Pacific. The train made fairly tight connections with the NP North Coast Limited to and from the east in Butte. The train was discontinued in 1951 as UP continued make changes to its passenger train schedules.
Challenger (train) Alas, in 2013 the site closed. Model Trains. Each train required an engineer, brakeman, conductor, fireman, baggageman, car attendants, cooks, waiters, lounge car attendants and sleeping car attendants.
Union Pacific Donates Steam Locomotives, Passenger Cars for Restoration September 24, 1967
3985 is one of only two Challengers still in existence and the only one to have operated in excursion service. UP's fleet, although it remained a permanent fixture on its timetable by the mid-1950s. Instead SP, UP and C&NW diners and their crews were switched in and out of the consists at various stations along its route. Like #949, #951 and #963, it was bought to haul UP's passenger trains in 1955. It was officially retired in January 2020 and is stored in Cheyenne, Wyoming, but has since been acquired by the Railroading Heritage of Midwest America (RRHMA) in Little Silvis Shops in Silvis, Illinois, where the locomotive is now being restored to operation once again.
MTH 30-1107 Union Pacific 4-6-6-4 Challenger Steam Locomotive & Tender Union Pacific Challenger | Detailed Pedia Trains 5 and 6 were discontinued. "The cars are being completed now in eastern shops for the initial run." Direct service began to West Yellowstone, with the completion of the branch itself. May 28, 1928
They operated over most of the Union Pacific . Union Pacific Challenger Class 4-6-6-4 #3977 is on display at Cody Park in North Platte, NE.
HO Scale AHM/Rivarossi 4-8-4 FEF3 UNION PACIFIC #8444 Item #5098 New None preserved. On August 1, 1940 the Cascade Basin was removed from the consist account of light business. It was donated to the City of North Platte by the Union Pacific and installed at the park in October 1968. . One of two lines of San Francisco to New York sleepers on San Francisco Overland discontinued, remaining line alternates between NYC and PRR. Due to the increase in traffic of World War II a second train was added on December 31, 1944, the Furloughee Challenger.
Union Pacific Challenger - Wikipedia SP diners, lounges, coffee-shop, and baggage-dormitory cars on no. No new diesel locomotives were specifically purchased by SP, UP and the C&NW for the Gold Coast. (Deseret News, April 2, 1970), "Along with the New Orleans-Jacksonville Gulf Wind, the Butte Special was the last train in the U.S. to have open sections (until Amtrak Day 5/1/1971 when it finished its last run). fleet, lasted until October of 1955 when the railroad became dissatisfied with the Although the primary and secondary Overland passenger trains certainly varied in their consists from train to train, from day to day, and from year to year, from its conception the Gold Coast also varied from hour to hour along its route. They were nearly 122ft (37m) long and weighed 537 short tons (487 tonnes). The equipment was spartan and the meal service was advertised as "three meals for under a dollar a day." 7 and No. Additional equipment and enhanced service notwithstanding, 105 years of carrying passengers came to an end for Union Pacific on May 1, 1971.
Union Pacific Train Toys - Etsy 3985 was designed by Union Pacific and built in 1943 by the American Locomotive Company. area51vintageshop. 1, UP 5100-5104 Articulated Dormitory-Kitchen-Diner, SP 2414/15, 2416/17 Articulated Chair Car, UP 5100, 5101, 5102, 5103, 5104 (articulated diners), UP 4049, 4050, 4051, 4052, 4054, 4055, 4056, 4059, 4060, 4061, 4062, 4063, 4064, 4065, and 4066 (40 seat diners), UP 3600, 3601, 3602, 3603, 3604, 3607, 3608, 3613, 3614, 3630, 3631, 3632, 3633, 3634, 3667, 3669, 3671, 3672, 3673, 3674, 3675, 3676, 3677, 3678, 3682, 3683, 3684, 3688, 3692, 3693, 3696 and 3697 (36 seat diners), In 1947 the train between Spokane and Portland was called, Train numbers 1st 19 and 20 and 2nd 19 and 20, also known as. On June 22, 1940 the service returned with a mainly lightweight consist which ran until September 16th. Gebraucht & gnstig kaufen bei medimops. essentially ending its run. But it remains on UPs active roster, sharing the same PTC exemption as the other two engines. The cafe-lounge remained until shortly after the loss of the mail contracts in late 1967. Between July and November 1937 Pullman-Standard delivered a group of lightweight Chair cars and twin-unit dining cars for this train; some of these units were built for Southern Pacific ownership in-as-much as a San Francisco Challenger had been inaugurated on September 15th of that year. In a confirmation of fears that Precision Scheduled Railroading could adversely affect Union Pacific steam operations despite the recent revival of Big Boy UP 4014, the railroad has announced it will curtail its steam and heritage operations, citing PSR as the reason. (Salt Lake Telegram, December 18, 1905; Daily Utah State Journal, December 19, 1905), The first westbound Los Angeles Limited was also the first train to use the newly completed Ninth South passenger main in Salt Lake City, meeting the mainline at Buena Vista. It will carry standard
(Wayner, Car Names Numbers and Consists, 1972, page 164). According to a note in the Guide, "Nos. However, its discontinuance was short-lived and by 1954 the train was back, this time sporting lightweight cars of its own built by both Pullman-Standard and American Car & Foundry. 4014 following the Big Boy's restoration. It refers to Union Pacific Challenger #4014. 103-104, the COLA." The Challengers were named passenger trains on the Union Pacific Railroad and the Chicago and North Western Railway . M. Pullman) had been used on the Orange Blossom Special in the 1938-39 winter season runs between New York and Florida. By the time I rode it in 1970 they were no longer using the stove and were only serving cold sandwiches, etc. The new schedule for the Pacific Limited shortened the schedule between Chicago and San Francisco by 10 hours, including 2 hours over the C&NW between Chicago and Council Bluffs, 6-1/2 hours over the UP between Council Bluffs and Ogden, and 1/2 hour over the CP between Ogden and San Francisco. These cars are handled on Trains 35 and 36 between Salt Lake City and Pocatello. . Service into Chicago was originally provided through a connection with the Chicago and Northwestern and later the Milwaukee Road. Find many great new & used options and get the best deals for Union Pacific / C&NW / SP Advertising Brochure - The Challenger Passenger Train at the best online prices at eBay! None preserved. Calculated tractive effort is 97,350lbf (433.0kN). to a respectable 39 hrs. William Kratville wrote in his "Union Pacific Streamliners" book: On January 10, 1954 the Los Angeles Challenger was re-established between Chicago and Los Angeles with streamlined equipment and diesel power. Originally built by the Pullman-Standard Co. in 1958, it was one of the last dome cars produced in the United States and can seat 24 in . August 27, 1942
(The Yellowstone Express train is not mentioned in online newspapers after 1933.). In February 1955 dome coaches were added to the Challenger, the first on any UP train.
LIONEL-TRAINS - Suncrest Farms M. Pullman was to have been replaced by the car American Milemaster (2 double bedroom, 1 comp-1 drawing room) as soon as it returned from the New York World's Fair but no record could be found that it ran on the Special. See also: "Union Pacific's Challenger, An Unusual Passenger Train, 1935-1971" by Patrick C. Dorin, TLC Publishing, 2001, See also: John Carroll's two-part article in The Streamliner, published by the Union Pacific Historical Society in 1994-1995, "The Challenger" Part I, The Train, in Volume 9, Number 4
One of my regrets is that I never had the opportunity to ride that train." Get the best deals on Union Pacific Railroad HO Model Train Locomotives. Union Pacific has the technical expertise and money to keep these steam giants running. Photo, Print, Drawing Challenger, streamlined passenger train, of the Union Pacific. 27 and 28 from and to Omaha.". (333 ICC 414), On January 7, 1968, Union Pacific applied to the ICC for permission to discontinue Trains 5 and 6, the passenger-mail train between Los Angeles and Omaha. (Read more about UP's City of St. Louis passenger train).
The "49er" (Train) - American-Rails.com Members enjoy 15% off any purchase in our store. (train) The Challengers were named passenger trains on the Union Pacific Railroad and the Chicago and North Western Railway (which was replaced in 1955 by the Milwaukee Road ). 3977, is on display in North Platte, Neb. ICC Finance Docket 24935, reported in 333 ICC 413; decided on June 20, 1968; decision was that the train's operation should be continued for the public good. The first passenger trains were undeniably crude; they seldom traveled more than 20 miles per hour and meals were eaten quickly in station dining halls. 11 and 12 run between Pocatello and Portland. Best known among these is Union Pacific 3985, one of 105 Challengers built for the railroad. American-Rails.com collection. The Milwaukee Road embarked upon a repainting program and all its passenger rolling stock received Union Pacific's Armour Yellow and Harbor Mist Gray colors (the MILW retained its traditional orange-and-black livery for freight units). Oregon Short Line took possession of its seven branch feeder lines, comprising 390.5 miles of trackage, mostly in southern Idaho. Locomotives 3900-3905 formed the Rio Grande's Class L-97. "The Challenger" Part II, The Equipment, in Volume 10, Number 1, (View a list of Pullman cars assigned to The Columbine during the 1930s), In conjunction with the World's Fair in San Francisco, the "Overland Route" railroads (C&NW, UP, SP) began what was to be the last regular transcontinental all Pullman service with the "Forty Niner". The trip between Chicago and the Coast by the Los Angeles Limited is an exposition of what the West stands for socially, commercially, and from an agricultural standpoint.". Baggage car 3985's next stop - Trains Magazine - Trains News Wire, Railroad News, Railroad Industry News, Web Cams, and Forms", "Railroading Heritage of Midwest America, Union Pacific agree to donation of Challenger, other locomotives, cars", "Railroading Heritage of Midwest America - official website", "Work begins on Union Pacific Challenger No.